CASE / INFRASTRUCTURE

Metro de Medellín

An operational pilot to connect information on resources, mobility and emissions.

16 weeksof reported pilot
6 flowsresources considered
One readingto prioritize actions

Data that makes sense from the operation.

  • 01ResourcesWater, energy and fuels within an operational view.
  • 02Mobility and wasteFlows that usually live in different sources, teams and periods.
  • 03Fugitive emissionsA category that requires a source, method and owner before results are communicated.

PUBLIC REFERENCE

A pilot is not a universal result.

Case context

This page keeps the distinction between pilot, scope and result. Any later publication must confirm the period, methodology, evidence and authorization of the organization.

Want to start a pilot backed by evidence?

Book a conversation →